H.N.E. was awarded the concession for the hydroelectric operation of the El Ciego Plant in 1952, as an extension to the hydroelectric operation of Barasona, for a maximum flow volume of 12 m3/s.

Power plant facilities

  • One MAIER MASCHINENFABRIK GMBH brand, Francis-type, horizontal turbine, No 1,760, 4,500 HP, 35 m head, with a nominal speed of 375 rpm, maximum flow of 12 m3/s
  • One Alternator, brand SIEMENS SCHUCHERT, model VFW 560/22-16, with a voltage of 6,600 V, I= 350 A, rating of 4,000 KVA, rpm= 375 +85%, 50 Hz

Location

The plant is located near the municipality of Estada which is situated in the administrative county of Somontano; in the valley of Cinca, between two channels: the channel of Aragón y Cataluña and the channel of Hidro-Nitro.

It is at a distance of 11 Km from the administrative capital Barbastro and 61 Km from the city of Huesca.